Connectivity by design: Why mobile coverage should not be an afterthought in new development
A new development can have an electricity connection, an agreed drainage strategy and fibre-ready infrastructure, but still leave occupiers struggling to make a reliable mobile call. The problem is not whether connectivity matters; it is that mobile connectivity can still be considered too late in the development process.
There are already requirements around fixed digital connectivity. In England, Building Regulations require new homes to be equipped with gigabit-ready infrastructure and, in most cases, a gigabit-capable connection. But a fibre connection to a home or building is not the same as reliable mobile coverage throughout it.
That distinction matters. While national policy recognises the importance of digital infrastructure, the extent to which mobile connectivity is addressed through the development process remains inconsistent. The result can be that connectivity issues are discovered only after buildings have been designed, built and occupied, when they may be more difficult and expensive to solve.
Why can new development create connectivity problems?
New development cannot simply inherit whatever mobile coverage existed before construction.
Modern building materials, including metallised insulation, low-emissivity glazing and reinforced concrete, can inhibit mobile signals. A site that appears adequately served on an external coverage map may therefore perform very differently inside the completed building. Large developments can also create additional demand that existing network capacity may not have been designed to accommodate.
Timing can compound the problem. Homes and commercial premises may be occupied before additional network infrastructure is available. If requirements for rooftop equipment, ducts, risers, power, backhaul, access or third party consents have not been considered during design, obtaining and/or installing them later can become considerably more complicated. Retrofitting may need to navigate existing plant, fire strategies, structural constraints, warranties, leases and property rights.
What might have been a relatively straightforward design and infrastructure question can then become a property, planning, engineering and commercial problem, at a point when the developer may have fewer options for resolving it.
Part of the challenge is that responsibility is fragmented. Developers, operators, planning authorities and other public bodies each influence different parts of the process, which makes early coordination particularly important.
Should connectivity be planned like other infrastructure?
Not entirely. A developer cannot control where a mobile operator invests, how it configures its network or what service it will provide in future. Electricity, water, drainage and transport needs are considered early in the development process. Should mobile connectivity be considered in the same way?
The government's UK Infrastructure: A 10 Year Strategy already recognises the value of considering digital needs early, rather than facing costly retrofits later. For new development, the opportunity is to bring connectivity into the conversation early enough to assess what may be needed, identify potential constraints and preserve the options for addressing them through the design.
Some places are already taking a different approach
There is no need to look overseas to see what a more proactive approach could look like.
The London Plan treats digital connectivity infrastructure as comparable in importance to energy, water and waste infrastructure. Development proposals should meet the expected demand for mobile connectivity generated by a development and support the effective use of rooftops and the public realm to accommodate suitably located mobile digital infrastructure. London's supporting guidance takes that approach into the development process. Relevant applicants are encouraged to show evidence of engagement with broadband and mobile operators and, where possible, demonstrate that a development will be "connection-ready" on first occupation.
Elsewhere in the UK, there is growing recognition that digital connectivity needs to form part of new development, but the approach varies. Bristol's proposed Local Plan, for example, would require Connectivity Statements with planning applications and expects engagement with providers where appropriate connectivity is not already available.
The issue, therefore, is not the absence of possible solutions - it is their inconsistent application.
What can we learn from elsewhere?
International approaches offer some useful lessons. Australia is a particularly interesting example. Its national Telecommunications in New Developments policy expressly expects mobile connectivity to receive the same consideration as fixed infrastructure in new developments. Developers are encouraged to engage mobile network operators early, establish whether existing coverage will have sufficient capacity for the proposed development and identify or reserve suitable sites or spaces for mobile infrastructure before designs are fixed. Importantly, the mobile provisions are principally policy expectations rather than equivalent statutory duties, and Australia continues to experience variation in implementation at state and local level.
The answer for the UK may look different, but the principle is transferable: connectivity should form part of the development conversation while there is still an opportunity to design for it.
What should developers consider now?
In the meantime, there are practical steps developers can take to consider connectivity more systematically.
Five practical steps can make a difference:
- Assess connectivity early. Understand existing mobile coverage and capacity, together with the additional demand that the proposed development is likely to create.
- Engage operators and infrastructure providers. Early conversations can help identify network constraints and potential solutions while designs remain flexible.
- Plan for infrastructure. Consider whether rooftops, ducts, risers, equipment space, power and backhaul routes may need to be accommodated within the design.
- Identify the property rights required. Where apparatus may be needed, consider access, land rights and any Electronic Communications Code arrangements before ownership, occupational and building arrangements become difficult to unwind.
- Test rather than assume. External coverage maps, or the presence of a fibre connection, do not necessarily tell you what occupiers will experience inside the completed development.
Not every scheme will require the same response. The connectivity requirements of a small residential development will be very different from those of a major regeneration scheme, transport interchange or high-occupancy commercial development. The important point is that there should be a conscious assessment.
Building connectivity in from the outset
Technology will continue to change, as will the demands that people and businesses place on networks.
Developers do not need to predict which technology or operator will serve a building in ten years' time. What they can do is avoid unnecessarily constraining the options available to future occupiers and network providers.
For local authorities and other public bodies involved in major regeneration, masterplanning, land disposals, development agreements and public assets can also provide opportunities to consider digital connectivity alongside the other infrastructure required to make a new place work.
Mobile connectivity does not need to be guaranteed by the development process, but it does need to become part of the development process.
At TLT, our telecoms, real estate and planning specialists work across the issues that need to come together to make that happen, including development strategy, planning, land and access rights, the Electronic Communications Code and the practical arrangements required for telecommunications infrastructure. Considering those issues earlier can help identify constraints while there is still an opportunity to design around them, rather than having to retrofit a solution later.
If you would like to discuss the connectivity requirements of a development, regeneration project or existing estate, our telecoms team would be happy to help.
This publication is intended for general guidance and represents our understanding of the relevant law and practice as at November 2026. Specific advice should be sought for specific cases. For more information see our terms & conditions.
Get in touch
Related services
Get in touch
Insights & events

Connectivity by design: Why mobile coverage should not be an afterthought in new development

Right to Buy reform: does the 35-year exemption change the investment case for council housing?

Beyond golden brick: what the new VAT zero rate means for affordable housing

Crichel Down Rules reform: what the proposals mean for local authorities

Determining user age: Ofcom's rapid assessment of highly effective age assurance for under 16s

The Digital Fairness Act: Getting ready for the next wave of digital regulation

How can AI help telecommunications operators with their estates?

The Electronic Communications Code: What the PSTI Act changes

The Electronic Communications Code in court: Five lessons operators should be acting on now

The Electronic Communications Code: Building a resilient telecoms portfolio

The PRS Database Regulations: what lenders, receivers and insolvency practitioners need to know before taking control of a tenanted property

Developing land with telecoms apparatus: How the Electronic Communications Code can impact project delivery

The Electronic Communications Code: Key landowner rights and operator risks

The Electronic Communications Code: What you need to know

Is your organisation's land portfolio ready for the new contractual controls register?

Retail Agility: Navigating the AI frontier in retail

The land use challenge: creating a system to deliver net zero

EV Charging Infrastructure in Northern Ireland: Outlook | TLT

The fast and the curious: Empowering in-house lawyers to create business value

Driving Demand: EVCI Funding and Development Opportunities | TLT

Evolving Cities: How are social values influencing our workplaces?

Rebalancing act: the impact of retail transformation on people and stores

Plugging into electric vehicle opportunities | Whitepaper

TLT supercharges innovation and tech offering with strategic partner hire

TLT grows real estate offering with appointment of commercial expert

TLT adds 29 lawyers creating one of the largest practices of its kind in the UK

TLT supports on sale of Belfast City Centre ETAP Hotel

TLT grows housing and regeneration team with appointment of legal director

TLT advises The Guinness Partnership on £400 million real estate joint venture

TLT and TCLP launch contract tool to combat climate change in the built environment

TLT Expands National Real Estate Practice | TLT
TLT advises shareholders of Insight Legal on sale of cloud-based software company

TLT Expands Real Estate Offering with Public Sector Expert | TLT

Charting a sustainable course for the property market

TLT appointed to Network Homes legal services framework
TLT Partner Appointed Chair of North West Fraud Forum | TLT

Energise2030: Data Centres, grid reform and the race for power

The Balancing Act: Unblocking regeneration - public land, risk and delivery

The Balancing Act: Regeneration by the community, for the community

The Balancing Act: Regeneration beyond the contract

The Balancing Act: Partnerships, trust and patient capital

The Balancing Act: Setting the scene for regeneration

BNG - TLT and Belmont Estate talk nature positivity

What does the next generation of our cities look like?

Issues and trends driving the shape of our cities: expert view from Savills & TLT

Office, Retail, and City Centres - What does the future hold?

Aldersgate interview with TLT: clean energy generation

The social housing whitepaper - what changes are on the horizon?

%20790px%20X%20451px%2072ppi.jpg)
%20790px%20X%20451px%2072ppi.jpg)

%20%C3%94%C3%87%C3%B4%20790px%20X%20451px%2072ppi%20copy12.jpg)
%20%C3%94%C3%87%C3%B4%20790px%20X%20451px%2072ppi2.jpg)






%20%C3%94%C3%87%C3%B4%20790px%20X%20451px%2072ppi%20MANCHESTER5.jpg)
%20%C3%94%C3%87%C3%B4%20790px%20X%20451px%2072ppi34.jpg)